Gold Member Since 2017
Audited Supplier
Weifang Zhengyun International Trade Co., Ltd.

Steel Pipe, Welded Steel Pipe, Steel Tube manufacturer / supplier in China, offering Newest Copper Clad Steel Pipe, Steel Tubes, Welded Steel Pipe, 2017 Hot Sale! Hot Dipped Galvanized Temporary Fence/Removable Fence, Hot Dipped Galvanized or Electric Galvanized Temporary Fence and so on.

(/ )

Supplier Homepage Product Steel pipe welded steel pipe Newest Copper Clad Steel Pipe, Steel Tubes, Welded Steel Pipe

Newest Copper Clad Steel Pipe, Steel Tubes, Welded Steel Pipe

Purchase Qty.:
(Tons)
2-4 5-9 10-14 15-19 20+
FOB Unit Price: US $500 US $4,800 US $450 US $420 US $380
Purchase Qty. (Tons) FOB Unit Price
2-4 US $500
5-9 US $4,800
10-14 US $450
15-19 US $420
20+ US $380
Get Latest Price
Production Capacity: 500000 Pieces/Year
Transport Package: in Pallet or in Bulk
Payment Terms: L/C, T/T, D/P

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: ZY
  • Usage: Pipeline Transport, Construction & Decoration, Spe
  • Certification: ISO9001, SGS
  • Customized: Customized
  • W.T: 2.11-9.27mm
  • Length: 5.8m
  • Surface Treatment: Galvanized, Oil Coating, Lacquering
  • Specification: Carbon Steel
  • HS Code: 7308900000
  • Type: Welded
  • Section Shape: Round
  • Shape: Round
  • Guarantee: Low Price, High Quality, Timely Delivery
  • O.D: 1/2"-8"
  • Wall Thickness: 1.0mm-12mm
  • Production Standard: ASTM A53, BS1387, En10255, En10240, En10220, En102
  • Origin: Shandong China
Product Description
Newest Copper Clad Steel Pipe, Steel Tubes, Weld Steel Pipe
Product Description

Usages:
Water, gas, air and steam, black steel tubes and pipes are utilized for gas distribution inside and outside the house and for hot water circulation in boiler systems. It is also used for line pipes in oil and petroleum industries, for water wells and for water, gas and sewage purposes. It is not used for potable water or for drain waste or vent lines.
 
standards astm a135 astm a795 astm a53, bs1387, en10255, en10240, en10220, en10219, en39, din2440,.bs21,npt

main size:
o. d.: φ 21.3- φ 219.1 (mm)
wall thickness: 2.11- 8.18(mm)

type:erw

gr
ade:q195, q215,q235,q345,st37,st52,stk500,ss400,16mn

surface:galvanized or  black or painted


purpose:scaffolding system, fence tube, structural tube,

certificate:iso9001, jis, ce


Main details 
 
N.D.O.DW.T.WEIGHTSCHTEST  PRESSURENO.of  THREADS PER INCH
PLAIN ENDS
kg/mkg/ftGrade AGrade B
ininmminmmblkgalblkgalpsikg/cm2psikg/cm2
1/20.84021.30.1092.771.271.350.390.4140700507005014
3/41.05026.70.1132.871.691.790.520.5540700507005014
11.31533.40.1333.382.502.650.760.8140700507005011-1/2
1-1/41.66042.20.1403.563.393.591.031.104012008413009111-1/2
1-1/21.90048.30.1453.684.054.291.231.314012008413009111-1/2
22.37560.30.1543.915.445.771.661.76402300162250017611-1/2
2-1/22.87573.00.2035.168.639.152.632.7940250017625001768
33.50088.90.1253.186.727.122.052.17---12909115001058
0.1563.968.298.792.532.68---16001121870131
0.1884.789.9210.523.023.21---19301362260159
0.2165.4911.2911.973.443.654022201562500176
3-1/24.000101.60.1253.187.728.182.352.49---1120791310928
0.1563.969.5310.102.903.08---1400981640115
0.1884.7811.4112.093.483.69---16901191970139
0.2265.7413.5714.384.144.384020301432370167
44.500114.30.1253.188.719.232.652.81---1000701170828
0.1563.9610.7811.433.293.48---1250881460103
0.1884.7812.9113.683.934.17---15001051750123
0.2376.0216.0717.034.905.194019001342210155
55.563141.30.1563.9613.4114.214.094.33---1010711180838
0.1884.7816.0917.064.905.20---1220861420100
0.2195.5618.6119.735.67.01---14201001650116
0.2586.5521.7723.086.647.034016701171950137
66.625168.30.1884.7819.2720.435.876.23---1020721190848
0.2195.5622.3123.656.807.21---119084139098
0.2506.3525.3626.887.738.19---1360961580111
0.2807.1128.2629.968.619.134015201071780125
88.625219.10.1884.7825.2626.787.708.16---7805592065---
0.2035.1627.2228.858.308.79---85060100070
0.2195.5629.2831.048.929.46---91064107075
0.3228.1842.5545.1012.9713.75401340941570110
 Product Show
Newest Copper Clad Steel Pipe, Steel Tubes, Welded Steel Pipe

Production process

Newest Copper Clad Steel Pipe, Steel Tubes, Welded Steel Pipe
Production steps
Newest Copper Clad Steel Pipe, Steel Tubes, Welded Steel Pipe
product testing
  Newest Copper Clad Steel Pipe, Steel Tubes, Welded Steel Pipe
Our products
Newest Copper Clad Steel Pipe, Steel Tubes, Welded Steel Pipe

Packaging & Shipping                                                                                                                                                                                                                     

1. In bundle with 8-9 steel stripes for small diameter steel pipe

2. Wrapped the bundle with water-proof bag and then bundled by steel stripes and nylon lifting belt in both ends

3. Loose package for big diameter steel pipe

4. As per customer's requirement

We will sincerely and every friend cooperation!

Newest Copper Clad Steel Pipe, Steel Tubes, Welded Steel Pipe


Product advantages
 Good quality control systerm and service systerm
 Full experienced in export business in steel pipes
 Convenient location for transport
 Competitive price, best service,fast delivery
Flexible payment
 Huge supply capacity advantages,timely and effective delivery
 Big discount for repeat customers
 Professional manufacturing
 Package:
Normal Packing:In Bundles or In Bulks or waterproof package.
Special Packing:Plastic End or Knitting Bags or Packing according
 to customers' requirements.
Pipe End: Plain/Beveled/Thread with Coupling or cap.
Shipment:
Trade Terms:FOB/CIF/CFR
Payment Terms:L/C,T/T, Western Union.
Loading Port:Qingdao,China.
Delivery: Within 10-20days after we received deposit or L/C at sight.
More size you need,please kindly contact me anytime.

  FAQ
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-7 days if the goods are in stock. or it is 30-40 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below.Other payment term we can also discuss.
Over the years, we've installed thousands of fencing products of all types, including:
Barbed Wire Fencing
Razor Wire Fencing
Security Fencing System
Commercial Fencing System
Temporary Fencing
Crowd Control Barriers
Ornamental Fence
Expanded Metal fencing
Perforated Metal Fencing
Animal Fencing
Chain Link Mesh Roll
Welded Wire Mesh Roll/Panel
Stainless Steel Wire Mesh
Fencing post
Fencing Gate
Fence accessories
Contact Us
 website http://zhengyun.en.made-in-china.com
Tel:86 - 536 - 8812007
Have any questions we will reply to you in 24 hours in a timely manner, Hope we can better cooperate, we can provide the best price and service.

Send your message to this supplier
Avatar
Mr. Gao Yongzhe
manager
*From:
To: Mr. Gao Yongzhe
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now